RimWorld · Building
Geothermal generator
The Geothermal generator requires Geothermal power research and Construction 8. Its work to make is 12,000; base flammability is 0.5, base beauty −30, and base maximum hit points 500.
Stats & recorded effects
- Type2
- Power
- Required Research
- Geothermal power
- Skill 1
- Construction
- Skill 1 Level
- 8
- Work To Make
- 12,000
- Flammability Base
- 0.5
- Beauty Base
- -30
- Max Hit Points Base
- 500
Source context
Table [ edit ] · RimWorld, Anomaly DLC entries identified; broader edition coverage unspecified
Values follow the linked reference and its listed mode or variant. Unknown upgrade costs remain unspecified.





