Understand Torid
Useful when…
- Choose it when a primary launcher with toxin damage suits the loadout.
- Plan around its five-round magazine and 1.7-second reload.
- Keep the Incarnon Form profile distinct from standard fire.
Standard attacks
Grenade Impact is a projectile that deals 100 Toxin damage, with 15% critical chance, a 2× critical multiplier, and 23% status chance. Poison Cloud is a separate area attack that deals 40 Toxin damage, with 15% critical chance, a 2× critical multiplier, and 25% status chance. Its listed falloff spans 0 to 3 m, with damage reduced by 100% at the endpoint. These entries do not establish that both attacks necessarily damage the same target.
Incarnon Form
Incarnon Form is listed as a hitscan attack with 51 Toxin damage, 29% critical chance, a 3.1× critical multiplier, and 39% status chance. Its speed is 8, with no unit specified. No activation condition is given, so these properties describe a separate attack profile rather than standard fire.
Firing cycle and construction
The standard weapon is semi-automatic, with a fire rate of 1.5, a five-round magazine, and a 1.7-second reload. The blueprint costs 15,000 credits; construction costs 30,000 credits and takes 86,400 seconds (24 hours). Components are 600 Circuits, one Forma, two Bio Components, and 4,500 Salvage. Carmine Penta requires Mastery Rank 6; Kuva Ogris requires Rank 15 and is described as firing semi-automatically from a smaller magazine; Kuva Tonkor requires Rank 13 and is described as having increased reload speed. These differences alone do not establish direct substitutes.
Limitations and tradeoffs
- The five-round magazine and 1.7-second reload shape the firing cycle.
- Poison Cloud damage is fully reduced at its 3 m falloff endpoint.
- Incarnon Form has distinct properties, but no activation condition is specified.
Common mistakes to avoid
- Assuming the impact and cloud entries necessarily combine against one target.
- Applying Incarnon Form statistics to standard fire or assigning a unit to its speed.
- Confusing the blueprint cost with the construction cost.






